Paint is a system. A colour is just the last coat.
Almost every peeling wall in this country failed at the primer or on a surface that was still damp. The topcoat gets the blame and the credit, and deserves neither.
Specified by substrate and exposure.
Interior, exterior, wood, metal and floors — each a different system, not the same tin used everywhere.
Surface Preparation
Filled, sanded, cleaned and moisture tested. New plaster needs weeks, not days — painting it early guarantees failure later.
Primer & Build
The right primer for the substrate — alkali-resistant on new masonry, and a full build coat before any finish goes on.
Exterior Systems
Elastomeric and textured finishes that bridge hairline cracks and hold colour under direct sun instead of chalking within a year.
Decorative Finishes
Venetian plaster, metallics, limewash and stencilled work — applied by people who do it often enough to keep it even.

The wall has to be dry. There is no way around it.
Fresh cement is strongly alkaline and stays wet far longer than it looks. Paint it too early and the alkali attacks the binder from behind — the wall looks perfect for four months, then blisters in a straight line along the damp course. We meter the moisture before the first coat and will hold the programme rather than paint a wet wall.
Kamelion Company Brochures
The full product range, page by page. Open any page to read it full size.